Solar and battery storage in Tampa, Florida
What should I know about solar and battery storage in Tampa, Florida?
Tampa is in Hillsborough County and is served predominantly by Tampa Electric. As an investor-owned utility it operates net metering under Florida PSC Rule 25-6.065, which credits exported energy against later consumption and limits system size to 115% of your annual usage.
- County
- Hillsborough
- Utility
- TECO
- Building code zone
- Standard Florida wind-load requirements
- Florida Building Commission
- Net metering
- PSC Rule 25-6.065 applies
- Florida Public Service Commission
Last verified August 16, 2026
What is specific to Tampa
| County | Hillsborough |
| Predominant electric utility | Tampa Electric |
| Net-metering rules | Florida PSC Rule 25-6.065 applies (investor-owned utility) |
| Permitting authority | City of Tampa Construction Services |
| Building code zone | Standard Florida Building Code wind-load requirements for the local design wind speed |
Your utility: Tampa Electric
Tampa Electric is an investor-owned utility and its net-metering programme is governed by Florida PSC Rule 25-6.065, including the tier structure and the requirement that a system is not expected to produce more than 115% of the home’s annual consumption.
How production changes across the year in Tampa
Modelled output for Tampa peaks in May at 151.7 kWh per kW installed and bottoms out in December at 109.1 kWh — a spread of 28% between the best and worst months. Averaged across meteorological winter, output runs about 7% below the summer average. Peak output falls in a spring month rather than midsummer, which is what the model shows for every Florida location covered here.
| Month | kWh per kW installed |
|---|---|
| January | 122.2 |
| February | 120.4 |
| March | 151.2 |
| April | 151.0 |
| May | 151.7 |
| June | 127.9 |
| July | 125.8 |
| August | 123.5 |
| September | 126.1 |
| October | 136.7 |
| November | 122.9 |
| December | 109.1 |
Where to start
The three questions worth settling before you talk to an installer in Tampa are what you are trying to achieve, how much electricity you actually use, and how much life your roof has left. Everything else follows from those.
- 1
Decide whether this is about the bill or about outages
Solar reduces what you buy. Storage changes what happens when the grid goes down. They are different purchases with different justifications, and bundling them obscures that.
- 2
Find your annual kilowatt-hours
Not your bill amount — your consumption. Florida usage swings hard between winter and summer, so use twelve months rather than one.
- 3
Assess the roof honestly
If it is near the end of its life, replace it first. Removing and reinstalling an array later is pure avoidable cost.
See what fits a Tampa home
Answer four questions and see what the verified data supports, with every assumption shown and nothing hidden behind a form.
Start an estimateCommon questions
Which utility serves Tampa?
Tampa Electric is the predominant residential electric utility for Tampa. Service territory does not follow city limits, so confirm against your own bill — an address near a boundary can be served by a different utility, and that changes the net-metering terms.
Is solar permitting different in Hillsborough County?
Hillsborough County follows the standard Florida Building Code wind-load requirements for its design wind speed. Permitting detail and turnaround still vary between jurisdictions, so ask your installer about their recent timelines here specifically.
Do I need a battery in Tampa?
Only if outages matter to you. Where net metering is available it already shifts your midday production to the evening, so a battery usually buys resilience rather than bill savings. That is a legitimate purchase — it is just worth pricing separately so you know what you are buying.
Sources
What each source supports on this page, and when we last verified it. Every source we use, with its freshness policy, is listed in the source register.
Florida Building Code — high-velocity hurricane zone and wind-borne debris provisions
Florida Building Commission
Wind-load and permitting requirements applying to rooftop solar installations in Florida, including the High-Velocity Hurricane Zone in Miami-Dade and Broward counties.
Verified August 16, 2026
Florida Public Service Commission
Net-metering eligibility, interconnection tiers and system-sizing limits for customers of Florida investor-owned utilities.
Verified August 16, 2026
Florida Statutes §212.08(7)(hh), Solar energy systems sales and use tax exemption
Florida Legislature
Exemption of solar energy systems and components from Florida sales and use tax.
Verified August 16, 2026
National Renewable Energy Laboratory
Modelled annual AC energy production for a given location, tilt, azimuth and loss assumption.
Verified August 17, 2026 · Production values not yet ingested in this environment. See scripts/ingest-solar-resource.ts. NREL became the National Laboratory of the Rockies and retired nrel.gov on 29 May 2026; this API now lives on developer.nlr.gov, per https://developer.nlr.gov/docs/nlr-domain-transition/. The organisation name is kept as "National Renewable Energy Laboratory" because that is how the PVWatts model is cited in the literature.
Where to go next
Solar panel cost in Tampa, Florida
How much does solar cost in Tampa, Florida?
Home battery storage in Tampa, Florida
What does a home battery cost and do in Tampa, Florida?
Tampa Electric: solar and battery rules
What are TECO's rules for home solar and batteries?
Tampa Electric net metering
How does net metering work with TECO?
How does net metering work in Florida?
How does net metering work in Florida?