Solar and battery storage in Jacksonville, Florida

What should I know about solar and battery storage in Jacksonville, Florida?

Jacksonville is in Duval County and is served predominantly by JEA. As a municipal utility it sets its own net-metering programme, so statewide Florida solar advice does not necessarily describe your terms.

County
Duval
Utility
JEA
Building code zone
Standard Florida wind-load requirements
Florida Building Commission
Net metering
Set by the utility

Last verified August 16, 2026

What is specific to Jacksonville

Jacksonville, Florida at a glance
CountyDuval
Predominant electric utilityJEA
Net-metering rulesSet by JEA directly (municipal utility)
Permitting authorityCity of Jacksonville Building Inspection Division
Building code zoneStandard Florida Building Code wind-load requirements for the local design wind speed

Your utility: JEA

JEA is a municipal utility owned by the City of Jacksonville. Florida PSC Rule 25-6.065 governs investor-owned utilities, so it does not set JEA’s terms. JEA runs its own interconnection and net-metering programme, and its sizing limits, credit treatment and programme capacity can differ from the investor-owned utilities elsewhere in Florida. Check JEA’s current programme terms before sizing a system in Jacksonville.

How production changes across the year in Jacksonville

Modelled output for Jacksonville peaks in May at 146.2 kWh per kW installed and bottoms out in December at 92.4 kWh — a spread of 37% between the best and worst months. Averaged across meteorological winter, output runs about 23% below the summer average. Peak output falls in a spring month rather than midsummer, which is what the model shows for every Florida location covered here.

Modelled monthly AC output per kW installed — Jacksonville, FL
MonthkWh per kW installed
January106.5
February101.1
March135.5
April141.3
May146.2
June126.2
July132.4
August131.5
September117.6
October116.9
November107.1
December92.4

Where to start

The three questions worth settling before you talk to an installer in Jacksonville are what you are trying to achieve, how much electricity you actually use, and how much life your roof has left. Everything else follows from those.

  1. 1

    Decide whether this is about the bill or about outages

    Solar reduces what you buy. Storage changes what happens when the grid goes down. They are different purchases with different justifications, and bundling them obscures that.

  2. 2

    Find your annual kilowatt-hours

    Not your bill amount — your consumption. Florida usage swings hard between winter and summer, so use twelve months rather than one.

  3. 3

    Assess the roof honestly

    If it is near the end of its life, replace it first. Removing and reinstalling an array later is pure avoidable cost.

See what fits a Jacksonville home

Answer four questions and see what the verified data supports, with every assumption shown and nothing hidden behind a form.

Start an estimate

Common questions

Which utility serves Jacksonville?

JEA is the predominant residential electric utility for Jacksonville. Service territory does not follow city limits, so confirm against your own bill — an address near a boundary can be served by a different utility, and that changes the net-metering terms.

Is solar permitting different in Duval County?

Duval County follows the standard Florida Building Code wind-load requirements for its design wind speed. Permitting detail and turnaround still vary between jurisdictions, so ask your installer about their recent timelines here specifically.

Do I need a battery in Jacksonville?

Only if outages matter to you. Where net metering is available it already shifts your midday production to the evening, so a battery usually buys resilience rather than bill savings. That is a legitimate purchase — it is just worth pricing separately so you know what you are buying.

Sources

What each source supports on this page, and when we last verified it. Every source we use, with its freshness policy, is listed in the source register.

  1. Florida Building Code — high-velocity hurricane zone and wind-borne debris provisions

    Florida Building Commission

    Wind-load and permitting requirements applying to rooftop solar installations in Florida, including the High-Velocity Hurricane Zone in Miami-Dade and Broward counties.

    Verified August 16, 2026

  2. JEA net metering and residential rates

    JEA

    JEA solar interconnection programme terms. JEA is a municipal utility and is not bound by Florida PSC Rule 25-6.065.

    Verified August 16, 2026

  3. Florida Statutes §212.08(7)(hh), Solar energy systems sales and use tax exemption

    Florida Legislature

    Exemption of solar energy systems and components from Florida sales and use tax.

    Verified August 16, 2026

  4. PVWatts® Calculator v8 API

    National Renewable Energy Laboratory

    Modelled annual AC energy production for a given location, tilt, azimuth and loss assumption.

    Verified August 17, 2026 · Production values not yet ingested in this environment. See scripts/ingest-solar-resource.ts. NREL became the National Laboratory of the Rockies and retired nrel.gov on 29 May 2026; this API now lives on developer.nlr.gov, per https://developer.nlr.gov/docs/nlr-domain-transition/. The organisation name is kept as "National Renewable Energy Laboratory" because that is how the PVWatts model is cited in the literature.